Day job
- Klipkopwildlife
-
- Offline
- Administrator
-
- I'm supposed to be retired!
Do it now, you may never get another chance
Please Log in or Create an account to join the conversation.
- THE BLACKBIRD
-
Topic Author
- Offline
- Forum Master
-
- Posts: 6732
- Thank you received: 10572
Attachments:
Please Log in or Create an account to join the conversation.
- Janine
- Offline
- Senior Member
-
- Janine
- Posts: 62
- Thank you received: 121
Please Log in or Create an account to join the conversation.
- THE BLACKBIRD
-
Topic Author
- Offline
- Forum Master
-
- Posts: 6732
- Thank you received: 10572
Attachments:
Please Log in or Create an account to join the conversation.
- Janine
- Offline
- Senior Member
-
- Janine
- Posts: 62
- Thank you received: 121
Please Log in or Create an account to join the conversation.
- Janine
- Offline
- Senior Member
-
- Janine
- Posts: 62
- Thank you received: 121
Please Log in or Create an account to join the conversation.
- Eric
-
- Offline
- Moderator
-
- Posts: 15334
- Thank you received: 14141
He might even have taken his winter woolies off!
if you are calm and collected when all about you are going berserk - you've missed something important!
Please Log in or Create an account to join the conversation.
- jon.in.swansea
-
- Offline
- Elite Member
-
- Posts: 750
- Thank you received: 1147
Last autumn when the kitchen work was starting we discovered a portion of the floor had no foundation - just a few layers of tiles over mud. We suspected the moisture was because the North wall of the kitchen was not at all protected from water runoff from the back garden. A concrete walkway had been added which was in places above the damp proof course which was not helping. A slice of that walkway was cut back and a trench cut to the base of the wall with the idea of intercepting the run-off.
I had added flashing to the lower portion of the wall but had not gotten around to installing the linear drain and tying it into the gutter drain. The day job was to complete the project.
This involved laying out the sections of the drain and adjusting the base of the trench to get a consistent slope. As the existing walkway was level along the length of the kitchen wall (albiet sloping down to the wall) this required planning for an increasing bevel along the length of the horizontal drain. I also needed to create an adaptor between the end of the linear drain and the side of the existing (complex face) of a ceramic gutter drain. My measures were pretty good and only a bit of filing was needed to the print to get it flush with the ceramic. I then traced the inside of the adaptor against the side of the ceramic and then carefully drilled the perimeter and then smoothed that out. That took several hours at a neck-hurting angle and an appreciation that so-called ceramic bits are consumables.
One of my put-it-off-till-later issues at the start was that my past projects were light on mixing concrete and mortar and doing finishing. This project upped my skills. I mixed concrete for the lower fill and let that set overnight. I then transitioned towards a mortar mix for the upper face and bevels. Indeed, I was able to get a good raised bevel against the wall as well as an increasingly sloped bevel against the edge of the walkway (from flat at the far end to 35mm below at the drain). I covered it all with a damp canvas drop cloth for 36 hours to gradually cure. I then used plumbers matt on the joint with the ceramic drain. A water test showed that it does indeed drain nicely.
And a view from the horizontal drain into the gutter drain. Only the bottom half of the adaptor circle was cut through to limit risk to the ceramic ...
Attachments:
Please Log in or Create an account to join the conversation.
- THE BLACKBIRD
-
Topic Author
- Offline
- Forum Master
-
- Posts: 6732
- Thank you received: 10572
Please Log in or Create an account to join the conversation.
- jon.in.swansea
-
- Offline
- Elite Member
-
- Posts: 750
- Thank you received: 1147
When I saw what slope was required on the horizontal drain I decided that the concrete walkway needed some bevel as well, increasing towards the drain end. I did that with circular blade at a 45 degree angle - a bit at a time in multiple passes. That gave me the angle for the bevel from the drain plastic to the existing concrete.
Please Log in or Create an account to join the conversation.
- Klipkopwildlife
-
- Offline
- Administrator
-
- I'm supposed to be retired!
Do it now, you may never get another chance
Please Log in or Create an account to join the conversation.
- Eric
-
- Offline
- Moderator
-
- Posts: 15334
- Thank you received: 14141
if you are calm and collected when all about you are going berserk - you've missed something important!
Please Log in or Create an account to join the conversation.
- jon.in.swansea
-
- Offline
- Elite Member
-
- Posts: 750
- Thank you received: 1147
Please Log in or Create an account to join the conversation.
- THE BLACKBIRD
-
Topic Author
- Offline
- Forum Master
-
- Posts: 6732
- Thank you received: 10572
The first shock was the price, i looked online for what was the best recommended £41 a tub the second shock was how far it went
That small area has taken 2 tub's so thats nearly 90 quid for that and iv got the rest of it to do the same now
Attachments:
Please Log in or Create an account to join the conversation.